services banner image

East Pump Station VFC Addition Project – Paterson, WA
Coeur d’Alene, ID

Modernization of Paterson River Intake Pump Station

The Columbia Water & Power District desired to modernize their existing Paterson River Intake Pump Station electrical distribution, pump motor controllers, and feeders. J-U-B’s Electrical Engineering Group (EEG) provided electrical and control systems engineering design and construction management for the District’s East Pump Station VFC Addition project.

Scope of Work and System Enhancements

The project consisted of:

  • Replacing four 1,500HP and two 250HP existing 2,400V FVNR starters with new Benshaw solid state soft starters

  • Installing a new 1,000HP, 2,400V Toshiba variable frequency controller and associated pump feeder raceways and conductors

  • Utility transformer secondary bus revisions

  • New power factor correction capacitors

  • New low voltage electrical distribution and lighting systems

  • New pump feeder distribution raceway system

  • New cable tray system

  • Integration of the existing pump control/SCADA system

  • Installation of a new air conditioner and ventilation system

  • Pump control valve and other incidental controls and instrumentation

  • Egress door replacement

  • Other incidental building improvements

Click to View
Related Services

Your Challenges. Our Expertise. Let’s Connect